綠濱墊的安裝:
1、將綠濱墊錯縫擺設就位,避免出現縱向貫通縫
2、將綠濱墊四邊立起,用綁線將相鄰邊沿鎖緊,綁鎖時,將綁線圍繞兩條重合的框線(縫合邊棱時) 或框線與網籠的雙扭結邊(縫合格柵時) 螺旋狀扭緊,避免重鍍鋅損傷,螺距不大于50 mm
3、當在已完成的底層網上面安裝綠濱墊時,應用綁線沿新裝雷諾護墊下部邊框將其固定在底層的雷諾護墊上,同一層相鄰的雷諾護墊也應用綁線相互系牢,使雷諾護墊連成一體
4、在某單元工程的同一水平層施工時,應將綠濱墊全部就位后才開始填充卵石,為了防止石籠網變形,相鄰兩個綠濱墊(包括同一綠濱墊墊的相鄰格室) 的填石高差不應大于35 cm
5、綠濱墊安裝前,應適當修整岸坡及地面,并盡可能保持岸坡原有形狀,但不應有明顯的隆起和凹陷
6、填充的卵石在河漫灘上選取,其抗壓強度應滿足設計要求,卵石粒徑應在8~20 cm 之間,并要求大小搭配合理以達到設計要求的空隙度和保證綠濱墊的直線外形
7、在綠濱墊內填卵石時,外露面應用粒徑不小于10 cm 的卵石,并用人工擺砌平整,以獲得美觀的表面和防止水流將卵石從網目淘走。應保證超填石料2. 5~3 cm 高,以便為沉陷留有余地
8、綠濱墊內填滿石料后即將頂蓋蓋下,然后用綁線將兩條重合的框線螺旋狀扭緊,螺距不應大于50 mm 。
9、在砌筑好的綠濱墊上鋪填10~15 cm的腐植土,以便植被生長。
 
Salesman: ychao order hotline: 15531800576
Guangdong green shore mat factory direct sale, green mat is how to assemble, green shore pad assembly which need several step, green shore ecosystem of the mat, shore slope defense green mat, we have skilled technical personnel, well-equipped, factory introduction of foreign advanced technology and equipment, and has the most advanced production lines, technical indicators have reached international product standards, is the professional manufacturer of modern river water conservancy engineering protection material! Trust you give us the first time, we are back to you 100% satisfaction!
The installation of green shore pad:
1, will be green shore break the decoration in place, to avoid the longitudinal penetration seam
2, the green shore pad set up four edges of bag, the adjacent edge locking with cable tie, tie lock, will tie line around two overlapping box line suture (edge) or frame line and double kink of mesh edge stitching (grating) spiral twist, avoid heavy galvanized damage, pitch is not more than 50 mm
3, when at the bottom of the completed online surface when installing green shore pad, application of tie line along the lower part of new Renault pads frame should be fixed in the bottom of the Renault pads on the same layer adjacent Renault pads used cable tie fastened to each other, become an organic whole repeatedly Renault pads
4, in a unit at the same level of the engineering construction, green shore pad should be after all in place began to fill the pebble, stone cage to prevent deformation, the adjacent two green shore pad (including the same green shore mat mat of adjacent lattice room) of rock fill height difference should not be greater than 35 cm